HF3121
Transparency and community engagement in trunk highway project development established, project scoping and development requirements established, transportation project activity portal required, legislative reports modified, and money appropriated.
Legislative Session 94 (2025-2026)
Bill text
(underlined = new law, struck through = current law the bill removes)
Versions
1.1A bill for an act
1.2relating to transportation; establishing certain transparency and community
1.3engagement in trunk highway project development; establishing project scoping
1.4and development requirements; requiring transportation project activity portal;
1.5modifying certain legislative reports; appropriating money; amending Minnesota
1.6Statutes 2024, sections 161.178, subdivision 1; 174.03, subdivision 12; 174.07,
1.7subdivision 3; 174.56; proposing coding for new law in Minnesota Statutes, chapters
1.8161; 174.
1.9BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
1.10Section 1. new text begin [161.1613] PUBLIC NOTICE. new text end
1.11 new text begin (a) The commissioner must provide a community notification for each major highway new text end
1.12 new text begin project, as defined in section 174.034, subdivision 1, on the trunk highway system and each new text end
1.13 new text begin project that is subject to the requirements under sections 161.162 to 161.167. The new text end
1.14 new text begin commissioner must distribute the community notification prior to inclusion of the project new text end
1.15 new text begin in the state transportation improvement program. new text end
1.16 new text begin (b) A community notification must: new text end
1.17 new text begin (1) summarize the nature and scope of the project, including information on accessing new text end
1.18 new text begin the project through the portal under section 174.034; and new text end
1.19 new text begin (2) be accompanied by available translated versions in appropriate languages if at least new text end
1.20 new text begin ten percent of the resident population in the project corridor is estimated to natively speak new text end
1.21 new text begin a language other than English. new text end
1.22 new text begin (c) The commissioner must distribute the community notification to each reasonably new text end
1.23 new text begin identifiable resident, property owner, business entity, and nonprofit organization that is new text end
1.24 new text begin located in an area within and extending at least one-half mile from the project limits or new text end
2.1 new text begin corridor of the project. The commissioner may distribute the community notification by new text end
2.2 new text begin mail, flyer, in-person, electronic means, or a combination. new text end
2.3 new text begin EFFECTIVE DATE. This section is effective January 1, 2026, for a project that first new text end
2.4 new text begin enters the state transportation improvement program on or after that date. new text end
2.5Sec. 2. new text begin [161.1615] COMMUNITY-ORIENTED PROJECT DEVELOPMENT. new text end
2.6 new text begin Subdivision 1. Definitions. (a) For purposes of this section, the following terms have new text end
2.7 new text begin the meanings given. new text end
2.8 new text begin (b) "Impacted municipality" means a statutory or home rule charter city or town in the new text end
2.9 new text begin impacted project area. new text end
2.10 new text begin (c) "Impacted project area" means the geographic area within and extending at least new text end
2.11 new text begin one-half mile from the project limits or corridor of a project, as determined by the new text end
2.12 new text begin commissioner. new text end
2.13 new text begin (d) "Project" means a (1) trunk highway project, or (2) scoping, assessment, study, or new text end
2.14 new text begin other analysis activity that is designed to identify or provide for development of a trunk new text end
2.15 new text begin highway project. new text end
2.16 new text begin Subd. 2. Application. (a) The requirements in this section apply to a project that: new text end
2.17 new text begin (1) meets one or more of the following: new text end
2.18 new text begin (i) the project involves construction, reconstruction, bridge replacement, an increase or new text end
2.19 new text begin reduction in highway traffic capacity, alteration of access, or acquisition of permanent new text end
2.20 new text begin right-of-way; or new text end
2.21 new text begin (ii) an environmental impact statement is required under chapter 116D for the project; new text end
2.22 new text begin and new text end
2.23 new text begin (2) first enters the state transportation improvement program for fiscal year 2030 or a new text end
2.24 new text begin subsequent year. new text end
2.25 new text begin (b) Except for a project under paragraph (a), clause (1), item (ii), the requirements in new text end
2.26 new text begin this section do not apply to reconditioning, resurfacing, milling, overlays, preventive new text end
2.27 new text begin maintenance, other routine roadway maintenance activity or projects, and associated new text end
2.28 new text begin set-asides. new text end
2.29 new text begin Subd. 3. Implementation; goals. The commissioner must implement the requirements new text end
2.30 new text begin under this section in a manner that: new text end
3.1 new text begin (1) does not conflict with the requirements under chapter 116D and the National new text end
3.2 new text begin Environmental Policy Act under United States Code, title 42, section 4331, et seq.; and new text end
3.3 new text begin (2) advances the following community engagement goals: new text end
3.4 new text begin (i) improving transparency among the public and interested parties in transportation new text end
3.5 new text begin project decision making; new text end
3.6 new text begin (ii) providing opportunities for the public to have a meaningful influence on public new text end
3.7 new text begin policy; new text end
3.8 new text begin (iii) fostering responsiveness to public input through development and modifications new text end
3.9 new text begin related to the scope and design of transportation projects, including with respect to new text end
3.10 new text begin environmental impacts; new text end
3.11 new text begin (iv) supporting communities that have been traditionally underrepresented in new text end
3.12 new text begin transportation project decision making; new text end
3.13 new text begin (v) enhancing efficient project delivery; and new text end
3.14 new text begin (vi) improving transportation project outcomes for transportation system users. new text end
3.15 new text begin Subd. 4. Community advisory assembly; members. (a) The commissioner must new text end
3.16 new text begin establish a community advisory assembly for each project. Each community advisory new text end
3.17 new text begin assembly is composed of: new text end
3.18 new text begin (1) each of the members of the policy advisory committee established under subdivision new text end
3.19 new text begin 5; new text end
3.20 new text begin (2) eight individuals who are residents in the impacted project area; new text end
3.21 new text begin (3) two individuals from business entities in each impacted municipality; new text end
3.22 new text begin (4) two individuals from community or nonprofit organizations in each impacted new text end
3.23 new text begin municipality; and new text end
3.24 new text begin (5) one individual from a Tribal government located in or closest to the impacted project new text end
3.25 new text begin area. new text end
3.26 new text begin (b) The commissioner must appoint members under paragraph (a), clauses (2) to (5), new text end
3.27 new text begin through an open appointments process under section 15.0597. To the extent feasible, the new text end
3.28 new text begin commissioner must select appointments under paragraph (a), clause (2), so that the number new text end
3.29 new text begin of residents of each impacted municipality is proportional based on the municipality's share new text end
3.30 new text begin of lane miles of the project compared to the total lane miles. new text end
4.1 new text begin Subd. 5. Policy advisory committee; members. (a) The commissioner must establish new text end
4.2 new text begin a policy advisory committee for each project. Each policy advisory committee is composed new text end
4.3 new text begin of the following officials: new text end
4.4 new text begin (1) two members of the legislature who represent any portion of the impacted project new text end
4.5 new text begin area, one jointly appointed by the senate majority leader and the senate minority leader and new text end
4.6 new text begin one jointly appointed by the speaker of the house and the minority leader in the house of new text end
4.7 new text begin representatives; new text end
4.8 new text begin (2) one county commissioner who represents a county in the impacted project area, new text end
4.9 new text begin appointed by the county board or by the Association of Minnesota Counties if the impacted new text end
4.10 new text begin project area extends beyond a single county; new text end
4.11 new text begin (3) one mayor who represents an impacted municipality; and new text end
4.12 new text begin (4) at least three but no more than five members of a city council in an impacted new text end
4.13 new text begin municipality. new text end
4.14 new text begin (b) The appointing authority for individuals under paragraph (a), clauses (3) and (4), is: new text end
4.15 new text begin (1) the Association of Metropolitan Municipalities if the impacted project area is in at new text end
4.16 new text begin least one city in a metropolitan county, as defined in section 473.121, subdivision 4; or new text end
4.17 new text begin (2) the League of Minnesota Cities. new text end
4.18 new text begin (c) The appointments made under paragraph (a), clause (4), must result in an odd number new text end
4.19 new text begin of members of the policy advisory committee. new text end
4.20 new text begin Subd. 6. Duties. (a) The duties of the community advisory assembly and the policy new text end
4.21 new text begin advisory committee are to provide recommendations to the commissioner regarding: new text end
4.22 new text begin (1) project purpose and need, as provided in subdivision 7; new text end
4.23 new text begin (2) criteria to use in evaluating design alternatives for the project, provided in subdivision new text end
4.24 new text begin 8, paragraph (a); and new text end
4.25 new text begin (3) a community-recommended design alternative for the project, as provided in new text end
4.26 new text begin subdivision 8, paragraph (b). new text end
4.27 new text begin (b) The policy advisory committee may provide a recommendation under paragraph (a) new text end
4.28 new text begin that is separate from a recommendation from the community advisory assembly. An new text end
4.29 new text begin additional duty of the policy advisory committee is to provide a final design recommendation, new text end
4.30 new text begin as provided in subdivision 9, paragraph (b). new text end
5.1 new text begin Subd. 7. Purpose and need. (a) Prior to specification of the draft purpose and need new text end
5.2 new text begin statement for a project, the commissioner must: new text end
5.3 new text begin (1) provide information to the community advisory assembly on project history, rationale, new text end
5.4 new text begin and other context; new text end
5.5 new text begin (2) facilitate analysis by the community advisory assembly of potential purposes, needs, new text end
5.6 new text begin issues, opportunities, goals, and considerations related to the project; new text end
5.7 new text begin (3) provide technical assistance in the development of recommendations by the new text end
5.8 new text begin community advisory assembly and the policy advisory committee on the project purpose new text end
5.9 new text begin and need; new text end
5.10 new text begin (4) hold a hearing on any purpose and need recommendations submitted to the new text end
5.11 new text begin commissioner by the community advisory assembly and the policy advisory committee, as new text end
5.12 new text begin provided under subdivision 10; and new text end
5.13 new text begin (5) develop the purpose and need statement giving full consideration to public input and new text end
5.14 new text begin the recommendations of the community advisory assembly and the policy advisory new text end
5.15 new text begin committee. new text end
5.16 new text begin (b) The commissioner must publish a community accountability review on the new text end
5.17 new text begin department's website that compares purpose and need recommendations of the community new text end
5.18 new text begin advisory assembly and the policy advisory committee to the final purpose and need statement new text end
5.19 new text begin for the project. At a minimum, the review must: new text end
5.20 new text begin (1) summarize notable differences between the recommendations and the purpose and new text end
5.21 new text begin need statement; new text end
5.22 new text begin (2) outline proposed activity by the commissioner to address or reconcile the differences; new text end
5.23 new text begin and new text end
5.24 new text begin (3) provide a justification or rationale for differences not addressed or reconciled. new text end
5.25 new text begin Subd. 8. Design alternatives; recommendations. (a) Prior to specification of a scoping new text end
5.26 new text begin document for a project, the commissioner must: new text end
5.27 new text begin (1) facilitate analysis by the community advisory assembly of (i) potential recommended new text end
5.28 new text begin design alternatives, and (ii) potential criteria to be used by the commissioner in evaluating new text end
5.29 new text begin design alternatives; new text end
5.30 new text begin (2) provide technical assistance in the development of recommendations by the new text end
5.31 new text begin community advisory assembly and the policy advisory committee on (i) a design alternative, new text end
5.32 new text begin and (ii) criteria to use in evaluating design alternatives; and new text end
6.1 new text begin (3) hold a hearing on any design alternatives evaluation recommendations submitted to new text end
6.2 new text begin the commissioner by the community advisory assembly and the policy advisory committee, new text end
6.3 new text begin as provided under subdivision 10. new text end
6.4 new text begin (b) Following the actions under paragraph (a), the community advisory assembly and new text end
6.5 new text begin the policy advisory committee may each develop one community-recommended design new text end
6.6 new text begin alternative for the project, in consultation with the commissioner. Each new text end
6.7 new text begin community-recommended design alternative is adopted by a vote of at least two-thirds of new text end
6.8 new text begin the appropriate membership of the community advisory assembly or the policy advisory new text end
6.9 new text begin committee. new text end
6.10 new text begin (c) The community advisory assembly and the policy advisory committee must develop new text end
6.11 new text begin recommendations under this subdivision based on the project purpose and need statement new text end
6.12 new text begin and in a manner that does not conflict with the requirements under chapter 116D and the new text end
6.13 new text begin National Environmental Policy Act under United States Code, title 42, section 4331, et seq. new text end
6.14 new text begin Subd. 9. Design alternatives; study and selection. (a) In the environmental impact new text end
6.15 new text begin statement under chapter 116D for a project, the commissioner must review each new text end
6.16 new text begin community-recommended design alternative adopted under subdivision 8, paragraph (b). new text end
6.17 new text begin (b) The commissioner must not select a preferred design alternative for a project unless new text end
6.18 new text begin the policy advisory committee approves a final design recommendation by a vote of at least new text end
6.19 new text begin two-thirds of the committee membership. The commissioner is not required to select the new text end
6.20 new text begin final design recommendation from the policy advisory committee as the preferred design new text end
6.21 new text begin alternative. new text end
6.22 new text begin Subd. 10. Public hearings. (a) Following submission of recommendations to the new text end
6.23 new text begin commissioner under subdivisions 7 and 8, the commissioner must hold at least one public new text end
6.24 new text begin hearing that provides for a review of the recommendations and allows interested persons new text end
6.25 new text begin to present comments and views. The hearing must be at a location within or reasonably new text end
6.26 new text begin close to the impacted project area. new text end
6.27 new text begin (b) At least 30 days before a hearing, the commissioner must provide notice of the new text end
6.28 new text begin hearing in a newspaper or other periodical of general circulation in the impacted project new text end
6.29 new text begin area. The notice must state the date, time, and place of the hearing and that individuals have new text end
6.30 new text begin an opportunity to present their comments and views. new text end
6.31 new text begin Subd. 11. Administration. (a) Compensation and removal of members of the community new text end
6.32 new text begin advisory assembly and the policy advisory committee are governed by section 15.059. new text end
7.1 new text begin (b) The community advisory assembly and the policy advisory committee are subject new text end
7.2 new text begin to the Minnesota Open Meeting Law under chapter 13D. new text end
7.3 new text begin EFFECTIVE DATE. This section is effective the day following final enactment. new text end
7.4Sec. 3. Minnesota Statutes 2024, section 161.178, subdivision 1, is amended to read:
7.5Subdivision 1. Definitions. (a) For purposes of this section, the following terms have
7.6the meanings given.
7.7(b) "Applicable entity" means the commissioner with respect to a project or portfolio
7.8for inclusion in the state transportation improvement program or a metropolitan planning
7.9organization with respect to a project or portfolio for inclusion in the appropriate metropolitan
7.10transportation improvement program.
7.11(c) "Assessment" means the impact assessment under this section.
7.12(d) "Capacity expansion project" means a project for trunk highway construction or
7.13reconstruction that:
7.14(1) is a major highway project, as defined in section deleted text begin 174.56 deleted text end new text begin 174.034 new text end , subdivision 1,
7.15paragraph deleted text begin (b) deleted text end new text begin (c) new text end ; and
7.16(2) adds highway traffic capacity or provides for grade separation of motor vehicle traffic
7.17at an intersection, excluding auxiliary lanes with a length of less than 2,500 feet.
7.18(e) "Greenhouse gas emissions" includes those emissions described in section 216H.01,
7.19subdivision 2.
7.20Sec. 4. Minnesota Statutes 2024, section 174.03, subdivision 12, is amended to read:
7.21Subd. 12. Trunk highway performance, resiliency, and sustainability. (a) The
7.22commissioner must implement performance measures and targets for the trunk highway
7.23system in order to construct resilient infrastructure, enhance the project selection for all
7.24transportation modes, improve economic security, and achieve the state transportation goals
7.25established in section 174.01.
7.26(b) At a minimum, the transportation planning process must include:
7.27(1) an inventory of transportation assets, including but not limited to bridge, pavement,
7.28geotechnical, pedestrian, bicycle, and transit asset categories;
7.29(2) establishment of statewide performance measures and targets, reporting of
7.30performance measure results, and where possible, performance forecasts that are:
8.1(i) statewide and, where data allow, district-specific;
8.2(ii) for assets in each asset category specified in clause (1); and
8.3(iii) identified in collaboration with the public;
8.4(3) gap identification and an explanation of the difference between performance targets
8.5and current status; and
8.6(4) life cycle assessment and corridor risk assessment as part of asset management
8.7programs in each district of the department.
8.8(c) At a minimum, the ten-year capital highway investment plan in each district of the
8.9department must:
8.10(1) be based on expected funding during the plan period and, to the extent feasible,
8.11maximize long-term benefits;
8.12(2) estimate the funding necessary to make optimal life cycle investments;
8.13(3) identify investments within each of the asset categories specified in paragraph (b),
8.14clause (1), that are funded through the trunk highway capital program;
8.15(4) identify specific trunk highway segments programmed to be removed from the trunk
8.16highway system; and
8.17(5) deliver annual progress toward achieving the state transportation goals established
8.18in section 174.01.
8.19 deleted text begin (d) Annually by December 15, the commissioner must report trunk highway performance deleted text end
8.20 deleted text begin measures and targets and identify gaps, including information detailing the department's deleted text end
8.21 deleted text begin progress on achieving the state transportation goals, to the chairs and ranking minority deleted text end
8.22 deleted text begin members of the legislative committees having jurisdiction over transportation policy and deleted text end
8.23 deleted text begin finance. The report must be signed by the commissioner. deleted text end
8.24Sec. 5. new text begin [174.034] TRANSPORTATION PROJECT ACTIVITY PORTAL. new text end
8.25 new text begin Subdivision 1. Definitions. (a) For purposes of this section, the following terms have new text end
8.26 new text begin the meanings given. new text end
8.27 new text begin (b) "Analysis activity" means an undertaking to analyze or study a highway or a corridor, new text end
8.28 new text begin whether prior to project identification or as part of project development. Analysis activity new text end
8.29 new text begin includes but is not limited to: (1) planning, assessment, project scoping, project development, new text end
8.30 new text begin land acquisition, environmental review, and project-related public engagement; and (2) a new text end
9.1 new text begin safety study or audit, a corridor analysis or study, a planning study, a feasibility analysis, a new text end
9.2 new text begin purpose and need assessment, or similar assessment or analysis. new text end
9.3 new text begin (c) "Major highway project" means a highway project that has a total cost for all segments new text end
9.4 new text begin that the commissioner most recently estimates to be at least (1) $15,000,000 in the new text end
9.5 new text begin metropolitan highway construction district, or (2) $5,000,000 in any nonmetropolitan new text end
9.6 new text begin highway construction district. new text end
9.7 new text begin Subd. 2. Portal establishment. The commissioner must maintain a centralized portal new text end
9.8 new text begin on the department's website that provides comprehensive information on highway projects, new text end
9.9 new text begin project development, studies and assessments, and related activity. new text end
9.10 new text begin Subd. 3. Portal design. The portal must: new text end
9.11 new text begin (1) provide a geographic information system interface that allows for identification of new text end
9.12 new text begin projects and analysis activity through interactive mapping; new text end
9.13 new text begin (2) identify: new text end
9.14 new text begin (i) each trunk highway project that is specified in the state transportation improvement new text end
9.15 new text begin program, excluding general or maintenance set-asides; the statewide multimodal new text end
9.16 new text begin transportation plan; the Minnesota state highway investment plan; or a ten-year capital new text end
9.17 new text begin highway investment plan in a district; new text end
9.18 new text begin (ii) each trunk highway project that reached substantial completion in the current or new text end
9.19 new text begin previous two calendar years; new text end
9.20 new text begin (iii) each trunk highway project that is planned for the ensuring 15 years; and new text end
9.21 new text begin (iv) each trunk highway segment or corridor for which the commissioner: (A) is new text end
9.22 new text begin undertaking analysis activity; or (B) has completed an analysis activity under subitem (A) new text end
9.23 new text begin within the previous five years; new text end
9.24 new text begin (3) identify department districts, jurisdictions of local units of government, state and new text end
9.25 new text begin local road systems, major geographic features, and relevant local landmarks; new text end
9.26 new text begin (4) provide the ability to search, filter, and apply mapping layer visibility based on new text end
9.27 new text begin location, dates, status, and common transportation categories; new text end
9.28 new text begin (5) present information in a manner that is readily understood by the general public; new text end
9.29 new text begin (6) allow for future extension to incorporate local road projects; and new text end
9.30 new text begin (7) provide access to the information required under subdivision 4 and the dashboard new text end
9.31 new text begin required under subdivision 5. new text end
10.1 new text begin Subd. 4. Information contents. (a) The commissioner must provide information on the new text end
10.2 new text begin department's website for each project or analysis activity identified under subdivision 3, new text end
10.3 new text begin clause (2). At a minimum, the information must include: new text end
10.4 new text begin (1) a plain language description of the nature and scope of the project or analysis activity; new text end
10.5 new text begin (2) as appropriate, the state project number and bridge number; new text end
10.6 new text begin (3) as appropriate, an explanation of the project purpose and need; new text end
10.7 new text begin (4) at least one map that identifies the project limits, corridor, or general location; new text end
10.8 new text begin (5) a timeline that provides any key milestones; new text end
10.9 new text begin (6) the primary documentation for the project or analysis activity, including but not new text end
10.10 new text begin limited to project layout and design plans, data and results from relevant modeling, and any new text end
10.11 new text begin studies or reports; new text end
10.12 new text begin (7) a fiscal overview that includes project or analysis activity cost and funding sources; new text end
10.13 new text begin (8) notice of any scheduled public meetings and, if testimony is being taken, the ability new text end
10.14 new text begin for an individual to arrange to testify; new text end
10.15 new text begin (9) details on each previous public meeting, including but not limited to meeting minutes, new text end
10.16 new text begin presentations, associated documents, and recordings; new text end
10.17 new text begin (10) identification of a project or analysis activity contact; and new text end
10.18 new text begin (11) for each major highway project, project details that at a minimum include: new text end
10.19 new text begin (i) project purposes relative to objectives in the statewide multimodal transportation new text end
10.20 new text begin plan and investment priority areas established in the Minnesota state highway investment new text end
10.21 new text begin plan; new text end
10.22 new text begin (ii) a history of the project, including but not limited to previous official actions by the new text end
10.23 new text begin department or the appropriate area transportation partnership, or both; the date on which new text end
10.24 new text begin the project was first included in the state transportation improvement plan; the cost of the new text end
10.25 new text begin project at that time; the planning estimate for the project; the engineer's estimate; the award new text end
10.26 new text begin price; the final cost as of six months after substantial completion, including any supplemental new text end
10.27 new text begin agreements and cost overruns or cost savings; the dates of environmental approval; the dates new text end
10.28 new text begin of municipal approval; the date of final geometric layout; and the date of establishment of new text end
10.29 new text begin any construction limits; new text end
10.30 new text begin (iii) the project's priority listing or rank within its construction district, if any, as well new text end
10.31 new text begin as the reasons for the listing or rank, the criteria used in prioritization or rank, any changes new text end
11.1 new text begin in the prioritization or rank since the project was first included in a department work plan, new text end
11.2 new text begin and the reasons for those changes; and new text end
11.3 new text begin (iv) past and potential future reasons for delay in letting or completing the project, details new text end
11.4 new text begin of all project cost changes that exceed $500,000, and specific modifications to the overall new text end
11.5 new text begin program that are made as a result of delays and project cost changes. new text end
11.6 new text begin (b) The commissioner must maintain and revise the information required under this new text end
11.7 new text begin subdivision in a timely manner, and must publish the public meeting information required new text end
11.8 new text begin under paragraph (a), clause (8), within two weeks of the meeting. new text end
11.9 new text begin Subd. 5. Fiscal transparency dashboard. The commissioner must provide a fiscal new text end
11.10 new text begin transparency dashboard on the department's website that summarizes fiscal information for new text end
11.11 new text begin the current fiscal year and each year in the state transportation improvement program. At a new text end
11.12 new text begin minimum, the dashboard must include: new text end
11.13 new text begin (1) a summary of total amounts by funding source and for projects; new text end
11.14 new text begin (2) identification of total expenditures associated with each objective in the statewide new text end
11.15 new text begin multimodal transportation plan under section 174.03, subdivision 1a, and resulting impacts new text end
11.16 new text begin on associated performance targets; and new text end
11.17 new text begin (3) an overview of expenditures by investment priority area established in the Minnesota new text end
11.18 new text begin state highway investment plan under section 174.03, subdivision 1c. new text end
11.19 new text begin Subd. 6. Implementation. The commissioner must implement the requirements of this new text end
11.20 new text begin section by the earlier of: (1) January 1, 2027; or (2) completion of necessary information new text end
11.21 new text begin technology changes. new text end
11.22Sec. 6. Minnesota Statutes 2024, section 174.07, subdivision 3, is amended to read:
11.23Subd. 3. Exceptions. This section does not apply to:
11.24(1) a law that establishes a requirement with general applicability for an agency or
11.25agencies to submit a report, including but not limited to reports and information under
11.26sections 14.05, subdivision 5, and 14.116;
11.27(2) a law that specifies a reporting expiration date or a date for the submission of a final
11.28report;
11.29(3) information required by law to be included in a budget submission to the legislature
11.30under section 16A.11;
11.31(4) the plans required under section 174.03, subdivisions 1a, 1b, and 1c;
12.1(5) the forecast information requirements under section 174.03, subdivision 9; and
12.2(6) the reports required under sections 161.088, subdivision 7; 161.089; 161.3203,
12.3subdivision 4; 165.03, subdivision 8; deleted text begin 174.03, subdivision 12; deleted text end 174.185, subdivision 3;
12.4174.247; 174.56, subdivisions 1 and 2; and 174.75, subdivision 3.
12.5Sec. 7. Minnesota Statutes 2024, section 174.56, is amended to read:
12.6174.56 REPORT ON deleted text begin MAJOR HIGHWAY PROJECTS, deleted text end TRUNK HIGHWAY
12.7 deleted text begin FUND deleted text end new text begin PERFORMANCE, new text end EXPENDITURES, AND EFFICIENCIES.
12.8Subdivision 1. Report required. deleted text begin (a) deleted text end The commissioner of transportation deleted text begin shall deleted text end new text begin must new text end
12.9submit a report by December 15 of each year on deleted text begin (1) the status of major highway projects deleted text end
12.10 deleted text begin completed during the previous two years or under construction or planned during the year deleted text end
12.11 deleted text begin of the report and for the ensuing 15 years, (2) trunk highway fund expenditures, and (3) deleted text end
12.12 deleted text begin efficiencies achieved during the previous two fiscal years deleted text end new text begin trunk highway system performance new text end
12.13 new text begin and department activity new text end .
12.14 deleted text begin (b) For purposes of this section, a "major highway project" is a highway project that has deleted text end
12.15 deleted text begin a total cost for all segments that the commissioner estimates at the time of the report to be deleted text end
12.16 deleted text begin at least (1) $15,000,000 in the metropolitan highway construction district, or (2) $5,000,000 deleted text end
12.17 deleted text begin in any nonmetropolitan highway construction district. deleted text end
12.18 deleted text begin Subd. 2. Report contents; major highway projects. For each major highway project deleted text end
12.19 deleted text begin the report must include: deleted text end
12.20 deleted text begin (1) a description of the project sufficient to specify its scope and location; deleted text end
12.21 deleted text begin (2) a history of the project, including, but not limited to, previous official actions by the deleted text end
12.22 deleted text begin department or the appropriate area transportation partnership, or both, the date on which deleted text end
12.23 deleted text begin the project was first included in the state transportation improvement plan, the cost of the deleted text end
12.24 deleted text begin project at that time, the planning estimate for the project, the engineer's estimate, the award deleted text end
12.25 deleted text begin price, the final cost as of six months after substantial completion, including any supplemental deleted text end
12.26 deleted text begin agreements and cost overruns or cost savings, the dates of environmental approval, the dates deleted text end
12.27 deleted text begin of municipal approval, the date of final geometric layout, and the date of establishment of deleted text end
12.28 deleted text begin any construction limits; deleted text end
12.29 deleted text begin (3) the project's priority listing or rank within its construction district, if any, as well as deleted text end
12.30 deleted text begin the reasons for that listing or rank, the criteria used in prioritization or rank, any changes deleted text end
12.31 deleted text begin in that prioritization or rank since the project was first included in a department work plan, deleted text end
12.32 deleted text begin and the reasons for those changes; deleted text end
13.1 deleted text begin (4) past and potential future reasons for delay in letting or completing the project, details deleted text end
13.2 deleted text begin of all project cost changes that exceed $500,000, and specific modifications to the overall deleted text end
13.3 deleted text begin program that are made as a result of delays and project cost changes; deleted text end
13.4 deleted text begin (5) two representative trunk highway construction projects, one each from the deleted text end
13.5 deleted text begin department's metropolitan district and from greater Minnesota, and for each project report deleted text end
13.6 deleted text begin the cost of environmental mitigation and compliance; and deleted text end
13.7 deleted text begin (6) the annual budget for products and services for each Department of Transportation deleted text end
13.8 deleted text begin district and office, with comparison to actual spending and including measures of productivity deleted text end
13.9 deleted text begin for the previous fiscal year. deleted text end
13.10Subd. 2a. Report contents deleted text begin ; trunk highway fund expenditures deleted text end . The commissioner
13.11 deleted text begin shall deleted text end new text begin must new text end include in the report new text begin : new text end
13.12 new text begin (1) a review of trunk highway performance measures and targets under section 174.03, new text end
13.13 new text begin subdivisions 1c and 12, including identification of gaps; new text end
13.14 new text begin (2) details on the department's progress on achieving the state transportation goals under new text end
13.15 new text begin section 174.01; new text end
13.16 new text begin (3) performance impacts for each major highway project, as defined in section 174.034, new text end
13.17 new text begin subdivision 1, that was substantially completed at least two and not more than four fiscal new text end
13.18 new text begin years before the fiscal year of the report, which must include: new text end
13.19 new text begin (i) a review of results from the project relative to objectives in the statewide multimodal new text end
13.20 new text begin transportation plan and trunk highway performance measures and targets; and new text end
13.21 new text begin (ii) for any substantial gaps or achievements under item (i), an analysis of factors, new text end
13.22 new text begin considerations, and resulting modifications in department practices; new text end
13.23 new text begin (4) the annual budget for products and services for each Department of Transportation new text end
13.24 new text begin district and office, including a comparison to actual spending and measures of productivity new text end
13.25 new text begin for the previous fiscal year; new text end
13.26 new text begin (5) new text end information on the total expenditures from the trunk highway fund during the previous
13.27fiscal year, new text begin which must include: new text end
13.28 new text begin (i) a breakout new text end for each Department of Transportation district deleted text begin , deleted text end in the following categories:
13.29road construction; planning; design and engineering; labor; compliance with environmental
13.30regulations; administration; acquisition of right-of-way, including costs for attorney fees
13.31and other compensation for property owners; litigation costs, including payment of claims,
13.32settlements, and judgments; maintenance; and road operations deleted text begin . deleted text end new text begin ; and new text end
14.1 new text begin (ii) any other categories or information identified by the commissioner to provide for new text end
14.2 new text begin expenditure overlap across the categories under item (i) and comparison to other fiscal new text end
14.3 new text begin reporting; and new text end
14.4 new text begin (6) efficiencies achieved during the previous two fiscal years. new text end
14.5Subd. 3. Department resources. The commissioner deleted text begin shall deleted text end new text begin must new text end prepare and submit the
14.6report with existing department staff and resources.
14.7 deleted text begin Subd. 4. Availability of information. The commissioner must maintain an Internet deleted text end
14.8 deleted text begin website that displays information for each major highway project. At a minimum, the deleted text end
14.9 deleted text begin information must include the report contents identified in subdivision 2. deleted text end
14.10Sec. 8. new text begin APPROPRIATION; PROJECT ACTIVITY PORTAL. new text end
14.11 new text begin $....... in fiscal year 2026 is appropriated from the trunk highway fund to the commissioner new text end
14.12 new text begin of transportation to implement the requirements under Minnesota Statutes, section 174.034. new text end
Bill information comes from public records published by the Office of the Revisor of Statutes, the Minnesota House and the Minnesota Senate. AI summaries are written by MinneSlate and are not official. MinneSlate is independent and is not affiliated with the State of Minnesota or the Minnesota Legislature.