1.1A bill for an act
1.2relating to energy; amending the exemptions to the certificate of need requirement;
1.3amending Minnesota Statutes 2024, section 216B.243, subdivision 8.
1.4BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
1.5Section 1. Minnesota Statutes 2024, section 216B.243, subdivision 8, is amended to read:
1.6Subd. 8. Exemptions. (a) This section does not apply to:
1.7(1) cogeneration or small power production facilities as defined in the Federal Power
1.8Act, United States Code, title 16, section 796, paragraph (17), subparagraph (A), and
1.9paragraph (18), subparagraph (A), and having a combined capacity at a single site of less
1.10than 80,000 kilowatts; plants or facilities for the production of ethanol or fuel alcohol; or
1.11any case where the commission has determined after being advised by the attorney general
1.12that its application has been preempted by federal law;
1.13(2) a high-voltage transmission line proposed primarily to distribute electricity to serve
1.14the demand of a single customer at a single location, unless the applicant opts to request
1.15that the commission determine need under this section or section 216B.2425;
1.16(3) the upgrade to a higher voltage of an existing transmission line that serves the demand
1.17of a single customer that primarily uses existing rights-of-way, unless the applicant opts to
1.18request that the commission determine need under this section or section 216B.2425;
1.19(4) a high-voltage transmission line of one mile or less required to connect a new or
1.20upgraded substation to an existing, new, or upgraded high-voltage transmission line;
1.21(5) conversion of the fuel source of an existing electric generating plant to using natural
1.22gas;
2.1(6) the modification of an existing electric generating plant to increase efficiency, as
2.2long as the capacity of the plant is not increased more than ten percent or more than 100
2.3megawatts, whichever is greater;
2.4(7) a large wind energy conversion system, as defined in section 216I.02, subdivision
2.512, or a solar energy generating system, as defined in section 216I.02, subdivision 18, for
2.6which a site permit application is submitted by an independent power producer under chapter
2.7216I;
2.8(8) a large wind energy conversion system, as defined in section 216I.02, subdivision
2.912, or a solar energy generating system, as defined in section 216I.02, subdivision 18,
2.10engaging in a repowering project that:
2.11(i) will not result in the system exceeding the nameplate capacity under its most recent
2.12interconnection agreement; or
2.13(ii) will result in the system exceeding the nameplate capacity under its most recent
2.14interconnection agreement, provided that the Midcontinent Independent System Operator
2.15has provided a signed generator interconnection agreement that reflects the expected net
2.16power increase;
2.17(9) energy storage systems, as defined in section 216I.02, subdivision 6;
2.18(10) transmission lines that directly interconnect large wind energy conversion systems,
2.19solar energy generating systems, or energy storage systems to the transmission system; deleted text begin or deleted text end
2.20(11) relocation of an existing deleted text begin high voltage deleted text end new text begin high-voltage new text end transmission line to new
2.21right-of-way, provided that any new structures that are installed are not designed for and
2.22capable of operation at higher voltage new text begin ; or new text end
2.23 new text begin (12) an upgrade or rebuilding of an existing electric line and associated facilities with new text end
2.24 new text begin a capacity of less than 100 kilovolts to a high-voltage transmission line with a capacity of new text end
2.25 new text begin 115 kilovolts, provided that at least 80 percent of the length of the upgraded or rebuilt new text end
2.26 new text begin high-voltage transmission line in Minnesota is located along an existing electric line new text end
2.27 new text begin right-of-way new text end .
2.28(b) For the purpose of this subdivision, "repowering project" means:
2.29(1) modifying a large wind energy conversion system or a solar energy generating system
2.30that is a large energy facility to increase its efficiency without increasing its nameplate
2.31capacity;
3.1(2) replacing turbines in a large wind energy conversion system without increasing the
3.2nameplate capacity of the system; or
3.3(3) increasing the nameplate capacity of a large wind energy conversion system.
3.4 new text begin EFFECTIVE DATE. This section is effective the day following final enactment and new text end
3.5 new text begin applies to any applicable project for which upgrading or rebuilding has begun on or after new text end
3.6 new text begin that date. new text end

Bill information comes from public records published by the Office of the Revisor of Statutes, the Minnesota House and the Minnesota Senate. AI summaries are written by MinneSlate and are not official. MinneSlate is independent and is not affiliated with the State of Minnesota or the Minnesota Legislature.