HF3289

Wetland replacement ratios modified.
Legislative Session 94 (2025-2026)

Related bill: SF992

Bill text

Introduction

ReadChanges
PDF
(underlined = new law, struck through = current law the bill removes)
1.1A bill for an act
1.2relating to natural resources; modifying wetland replacement ratios; amending
1.3Minnesota Statutes 2024, sections 103G.222, subdivision 1; 103G.2242, subdivision
1.412; 103G.2243, subdivision 2.
1.5BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
1.6Section 1. Minnesota Statutes 2024, section 103G.222, subdivision 1, is amended to read:
1.7Subdivision 1. Requirements. (a) Wetlands must not be drained or filled, wholly or
1.8partially, unless replaced by actions that provide at least equal public value under a
1.9replacement plan approved as provided in section 103G.2242, a replacement plan under a
1.10local governmental unit's comprehensive wetland protection and management plan approved
1.11by the board under section 103G.2243, or, if a permit to mine is required under section
1.1293.481, under a mining reclamation plan approved by the commissioner under the permit
1.13to mine. Project-specific wetland-replacement plans submitted as part of a project for which
1.14a permit to mine is required and approved by the commissioner on or after July 1, 1991,
1.15may include surplus wetland credits to be allocated by the commissioner to offset future
1.16mining-related wetland impacts under any permits to mine held by the permittee, the operator,
1.17the permittee's or operator's parent, an affiliated subsidiary, or an assignee pursuant to an
1.18assignment under section 93.481, subdivision 5. For project-specific wetland replacement
1.19completed prior to wetland impacts authorized or conducted under a permit to mine within
1.20the Great Lakes and Rainy River watershed basins, those basins are considered a single
1.21watershed for purposes of determining wetland-replacement ratios. Mining reclamation
1.22plans must apply the same principles and standards for replacing wetlands that are applicable
1.23to mitigation plans approved as provided in section 103G.2242. The commissioner must
1.24provide notice of an application for wetland replacement under a permit to mine to the
2.1county in which the impact is proposed and the county in which a mitigation site is proposed.
2.2Public value must be determined in accordance with section 103B.3355 or a comprehensive
2.3wetland protection and management plan established under section 103G.2243. Sections
2.4103G.221 to 103G.2372 also apply to excavation in permanently and semipermanently
2.5flooded areas of wetlands.
2.6(b) Replacement must be guided by the following principles in descending order of
2.7priority:
2.8(1) avoiding the direct or indirect impact of the activity that may destroy or diminish
2.9the wetland;
2.10(2) minimizing the impact by limiting the degree or magnitude of the wetland activity
2.11and its implementation;
2.12(3) rectifying the impact by repairing, rehabilitating, or restoring the affected wetland
2.13environment;
2.14(4) reducing or eliminating the impact over time by preservation and maintenance
2.15operations during the life of the activity;
2.16(5) compensating for the impact by restoring a wetland; and
2.17(6) compensating for the impact by replacing or providing substitute wetland resources
2.18or environments.
2.19For a project involving the draining or filling of wetlands in an amount not exceeding 10,000
2.20square feet more than the applicable amount in section 103G.2241, subdivision 9, paragraph
2.21(a), the local government unit may make an on-site sequencing determination without a
2.22written alternatives analysis from the applicant.
2.23(c) If a wetland is located in a cultivated field, then replacement must be accomplished
2.24through restoration only without regard to the priority order in paragraph (b), provided that
2.25the altered wetland is not converted to a nonagricultural use for at least ten years.
2.26(d) If a wetland is replaced under paragraph (c), or drained under section 103G.2241,
2.27subdivision 1, clause (1), the local government unit may require a deed restriction that
2.28prohibits nonagricultural use for at least ten years. The local government unit may require
2.29the deed restriction if it determines the wetland area drained is at risk of conversion to a
2.30nonagricultural use within ten years based on the zoning classification, proximity to a
2.31municipality or full service road, or other criteria as determined by the local government
2.32unit.
3.1(e) Restoration and replacement of wetlands must be accomplished in accordance with
3.2the ecology of the landscape area affected and ponds that are created primarily to fulfill
3.3stormwater management, and water quality treatment requirements may not be used to
3.4satisfy replacement requirements under this chapter unless the design includes pretreatment
3.5of runoff and the pond is functioning as a wetland.
3.6 deleted text begin (f) Except as provided in paragraph (g), for a wetland or public waters wetland located deleted text end
3.7 deleted text begin on nonagricultural land, replacement must be in the ratio of two acres of replaced wetland deleted text end
3.8 deleted text begin for each acre of drained or filled wetland. deleted text end
3.9 deleted text begin (g) For a wetland or public waters wetland located on agricultural land or in a greater deleted text end
3.10 deleted text begin than 80 percent area, deleted text end
3.11 new text begin (f) new text end Replacement must be in the ratio of one acre of replaced wetland for each acre of
3.12drained or filled wetland.
3.13 deleted text begin (h) deleted text end new text begin (g) new text end Wetlands that are restored or created as a result of an approved replacement plan
3.14are subject to the provisions of this section for any subsequent drainage or filling.
3.15 deleted text begin (i) deleted text end new text begin (h) new text end Except in a greater than 80 percent area, only wetlands that have been restored
3.16from previously drained or filled wetlands, wetlands created by excavation in nonwetlands,
3.17wetlands created by dikes or dams along public or private drainage ditches, or wetlands
3.18created by dikes or dams associated with the restoration of previously drained or filled
3.19wetlands may be used for wetland replacement according to rules adopted under section
3.20103G.2242, subdivision 1. Modification or conversion of nondegraded naturally occurring
3.21wetlands from one type to another are not eligible for wetland replacement.
3.22 deleted text begin (j) deleted text end new text begin (i) new text end The Technical Evaluation Panel established under section 103G.2242, subdivision
3.232, shall ensure that sufficient time has occurred for the wetland to develop wetland
3.24characteristics of soils, vegetation, and hydrology before recommending that the wetland
3.25be deposited in the statewide wetland bank. If the Technical Evaluation Panel has reason
3.26to believe that the wetland characteristics may change substantially, the panel shall postpone
3.27its recommendation until the wetland has stabilized.
3.28 deleted text begin (k) deleted text end new text begin (j) new text end This section and sections 103G.223 to 103G.2242, 103G.2364, and 103G.2365
3.29apply to the state and its departments and agencies.
3.30 deleted text begin (l) deleted text end new text begin (k) new text end For projects involving draining or filling of wetlands associated with a new public
3.31transportation project, and for projects expanded solely for additional traffic capacity, public
3.32transportation authorities may purchase credits from the board at the cost to the board to
3.33establish credits. Proceeds from the sale of credits provided under this paragraph are
4.1appropriated to the board for the purposes of this paragraph. For the purposes of this
4.2paragraph, "transportation project" does not include an airport project.
4.3 deleted text begin (m) deleted text end new text begin (l) new text end A replacement plan for wetlands is not required for individual projects that result
4.4in the filling or draining of wetlands for the repair, rehabilitation, reconstruction, or
4.5replacement of a currently serviceable existing state, city, county, or town public road
4.6necessary, as determined by the public transportation authority, to meet state or federal
4.7design or safety standards or requirements, excluding new roads or roads expanded solely
4.8for additional traffic capacity lanes. This paragraph only applies to authorities for public
4.9transportation projects that:
4.10(1) minimize the amount of wetland filling or draining associated with the project and
4.11consider mitigating important site-specific wetland functions on site;
4.12(2) except as provided in clause (3), submit project-specific reports to the board, the
4.13Technical Evaluation Panel, the commissioner of natural resources, and members of the
4.14public requesting a copy at least 30 days prior to construction that indicate the location,
4.15amount, and type of wetlands to be filled or drained by the project or, alternatively, convene
4.16an annual meeting of the parties required to receive notice to review projects to be
4.17commenced during the upcoming year; and
4.18(3) for minor and emergency maintenance work impacting less than 10,000 square feet,
4.19submit project-specific reports, within 30 days of commencing the activity, to the board
4.20that indicate the location, amount, and type of wetlands that have been filled or drained.
4.21Those required to receive notice of public transportation projects may appeal
4.22minimization, delineation, and on-site mitigation decisions made by the public transportation
4.23authority to the board according to the provisions of section 103G.2242, subdivision 9. The
4.24Technical Evaluation Panel must review minimization and delineation decisions made by
4.25the public transportation authority and provide recommendations regarding on-site mitigation
4.26if requested to do so by the local government unit, a contiguous landowner, or a member
4.27of the Technical Evaluation Panel.
4.28Except for public transportation projects that occur on state roads, for which the state
4.29Department of Transportation is responsible for the wetland replacement, the board must
4.30replace the wetlands, and wetland areas of public waters if authorized by the commissioner
4.31or a delegated authority, drained or filled by public transportation projects on existing roads.
4.32Public transportation authorities at their discretion may deviate from federal and state
4.33design standards on existing road projects when practical and reasonable to avoid wetland
4.34filling or draining, provided that public safety is not unreasonably compromised. The local
5.1road authority and its officers and employees are exempt from liability for any tort claim
5.2for injury to persons or property arising from travel on the highway and related to the
5.3deviation from the design standards for construction or reconstruction under this paragraph.
5.4This paragraph does not preclude an action for damages arising from negligence in
5.5construction or maintenance on a highway.
5.6 deleted text begin (n) deleted text end new text begin (m) new text end If a landowner seeks approval of a replacement plan after the proposed project
5.7has already affected the wetland, the local government unit may require the landowner to
5.8replace the affected wetland at a ratio not to exceed twice the replacement ratio otherwise
5.9required.
5.10 deleted text begin (o) deleted text end new text begin (n) new text end A local government unit may request the board to reclassify a county or watershed
5.11on the basis of its percentage of presettlement wetlands remaining. After receipt of
5.12satisfactory documentation from the local government, the board shall change the
5.13classification of a county or watershed. If requested by the local government unit, the board
5.14must assist in developing the documentation. Within 30 days of its action to approve a
5.15change of wetland classifications, the board shall publish a notice of the change in the
5.16Environmental Quality Board Monitor.
5.17 deleted text begin (p) deleted text end new text begin (o) new text end One hundred citizens who reside within the jurisdiction of the local government
5.18unit may request the local government unit to reclassify a county or watershed on the basis
5.19of its percentage of presettlement wetlands remaining. In support of their petition, the citizens
5.20shall provide satisfactory documentation to the local government unit. The local government
5.21unit shall consider the petition and forward the request to the board under paragraph deleted text begin (o) deleted text end new text begin (n) new text end
5.22or provide a reason why the petition is denied.
5.23Sec. 2. Minnesota Statutes 2024, section 103G.2242, subdivision 12, is amended to read:
5.24Subd. 12. Replacement credits. (a) No public or private wetland restoration,
5.25enhancement, or construction may be allowed for replacement unless specifically designated
5.26for replacement and paid for by the individual or organization performing the wetland
5.27restoration, enhancement, or construction.
5.28(b) Paragraph (a) does not apply to a wetland whose owner has paid back with interest
5.29the individual or organization restoring, enhancing, or constructing the wetland.
5.30(c) Notwithstanding section 103G.222, subdivision 1, paragraph deleted text begin (i) deleted text end new text begin (h) new text end , the following
5.31actions, and others established in rule, that are consistent with criteria in rules adopted by
5.32the board in conjunction with the commissioners of natural resources and agriculture, are
6.1eligible for replacement credit as determined by the local government unit or the board,
6.2including enrollment in a statewide wetlands bank:
6.3(1) reestablishment of permanent native, noninvasive vegetative cover on a wetland on
6.4agricultural land that was planted with annually seeded crops, was in a crop rotation seeding
6.5of pasture grasses or legumes, or was in a land retirement program during the past ten years;
6.6(2) buffer areas of permanent native, noninvasive vegetative cover established or
6.7preserved on upland adjacent to replacement wetlands;
6.8(3) wetlands restored for conservation purposes under terminated easements or contracts;
6.9(4) water quality treatment ponds constructed to pretreat stormwater runoff prior to
6.10discharge to wetlands, public waters, or other water bodies, provided that the water quality
6.11treatment ponds must be associated with an ongoing or proposed project that will impact a
6.12wetland and replacement credit for the treatment ponds is based on the replacement of
6.13wetland functions and on an approved stormwater management plan for the local government;
6.14and
6.15(5) in a greater than 80 percent area, restoration and protection of streams and riparian
6.16buffers that are important to the functions and sustainability of aquatic resources.
6.17(d) Notwithstanding section 103G.222, subdivision 1, deleted text begin paragraphs deleted text end new text begin paragraph new text end (f) deleted text begin and (g) deleted text end ,
6.18the board may establish by rule different replacement ratios for restoration projects with
6.19exceptional natural resource value.
6.20Sec. 3. Minnesota Statutes 2024, section 103G.2243, subdivision 2, is amended to read:
6.21Subd. 2. Plan contents. A comprehensive wetland protection and management plan
6.22may:
6.23(1) provide for classification of wetlands in the plan area based on:
6.24(i) an inventory of wetlands in the plan area;
6.25(ii) an assessment of the wetland functions listed in section 103B.3355, using a
6.26methodology chosen by the Technical Evaluation Panel from one of the methodologies
6.27established or approved by the board under that section; and
6.28(iii) the resulting public values;
6.29(2) vary application of the sequencing standards in section 103G.222, subdivision 1,
6.30paragraph (b), for projects based on the classification and criteria set forth in the plan;
7.1(3) vary the replacement standards of section 103G.222, subdivision 1, deleted text begin paragraphs deleted text end
7.2 new text begin paragraph new text end (f) deleted text begin and (g) deleted text end , based on the classification and criteria set forth in the plan, for specific
7.3wetland impacts provided there is no net loss of public values within the area subject to the
7.4plan, and deleted text begin so long as: deleted text end
7.5 deleted text begin (i) in a 50 to 80 percent area, a minimum acreage requirement of one acre of replaced deleted text end
7.6 deleted text begin wetland for each acre of drained or filled wetland requiring replacement is met within the deleted text end
7.7 deleted text begin area subject to the plan; and deleted text end
7.8 deleted text begin (ii) in a less than 50 percent area, a minimum acreage requirement of two acres of deleted text end
7.9 deleted text begin replaced wetland for each acre of drained or filled wetland requiring replacement is met deleted text end
7.10 deleted text begin within the area subject to the plan, except that replacement for the amount above deleted text end a 1:1 ratio
7.11can be accomplished deleted text begin as described in section 103G.2242, subdivision 12 deleted text end ; and
7.12(4) in a greater than 80 percent area, allow replacement credit, based on the classification
7.13and criteria set forth in the plan, for any project that increases the public value of wetlands,
7.14including activities on adjacent upland acres.

Bill information comes from public records published by the Office of the Revisor of Statutes, the Minnesota House and the Minnesota Senate. AI summaries are written by MinneSlate and are not official. MinneSlate is independent and is not affiliated with the State of Minnesota or the Minnesota Legislature.

Progress through the legislative process

17%
In Committee
Loading…